Supporting procurement and delivery at Western Sydney International Airport
At a glance
Western Sydney International (Nancy-Bird Walton) Airport (WSI) is the first major international greenfield airport development in Australia in more than 50 years. Western Sydney Airport Corporation needed a coordinated technical foundation to move major works into procurement and delivery.
As Master Engineer for the Airside and Landside Packages, we developed the Reference Designs and Performance Specifications that supported procurement, delivery and future expansion.
The challenge
Western Sydney International Airport is one of Australia's largest aviation infrastructure projects. It opened in October 2026 with a single 3.7km runway, four-level terminal building and a comprehensive landside road network, utility infrastructure and associated facilities.
Delivering infrastructure at this scale required coordination across multiple packages, including airside works, landside infrastructure, utilities, bulk earthworks and integration with the Sydney Metro Western Sydney Airport line.
As the project progressed from planning into procurement and delivery, the client needed Reference Designs and Performance Specifications for the Airside and Landside Packages. These had to provide a clear basis for design and construction (D&C), support the procurement of D&C contractors and manage interfaces across multiple delivery packages. They also needed to create a consistent technical framework for the airport’s future expansion.
Our response
Following the successful delivery of Project Management and Technical Support Services, we were awarded the Master Engineering Design Services contract.
Working with the client and specialist consultants, we developed coordinated Reference Designs that demonstrated compliant solutions and provided quantity take-offs to support budget estimates. We translated these designs into Performance Specifications that set clear requirements for D&C contracts across the airside, landside and utilities works. This gave the client a consistent basis for contractor procurement, and our support continued into delivery through design documentation reviews, site surveillance and testing and commissioning.
The scope of services covered almost all elements of the airport site, including:
- Airside infrastructure, including geometric design, pavements, drainage, navigational aids, Aeronautical Ground Lighting and Movement Area Guidance, Airfield Lighting Equipment Rooms (ALERs), and Ground Run-up Enclosure and associated noise studies.
- Sitewide landside infrastructure masterplanning, including roads, bridges, car parks, taxi holding facilities, drainage, lighting and pavement designs.
- Sitewide utility masterplanning, covering high and low voltage electrical systems, water, recycled water, sewer, aviation and non-aviation fuel supply, gas and communications networks.
- Operational facilities and airport systems, including Airport Operations and Emergency Operations Control Centre, Airside Access Control Point, Ground Maintenance Facility, Mechanical Workshop, Waste Disposal Facilities, Aircraft Lighting Equipment Rooms, fuel storage and supply facilities, and security systems.
- Sitewide technical studies, including geotechnical investigations, safety studies, flood assessments, traffic studies, and landscape and urban design.
The scope also included sitewide sustainability strategies that responded to ESD initiatives and climate change requirements, as well as interface management strategies between Airside and Landside D&C contractors, Terminal D&C contract, Bulk Earthworks contract and Sydney Metro.
The impact
Our long-term involvement with WSI enabled a consistent approach across key phases of the project’s development and provided continuity across major delivery packages.
Throughout the Master Engineering Design Services contract, we delivered every submission on time despite the challenges presented by the COVID-19 pandemic.
The Reference Designs remained within budget scope, supported Commonwealth approval and gave tenderers confidence that they could meet project requirements. They also provided D&C contractors with a clear basis for delivery.
In line with the client’s procurement strategy, the Performance Specifications defined the required outcomes without prescribing how contractors should achieve them. This maintained clear performance expectations while giving D&C contractors greater scope to innovate.