Creating a future-ready environment for maternity and neonatal care

Creating a future-ready environment for maternity and neonatal care

Client: The Queen’s Healthcare Systems

Sector: Health and Wellbeing

The Queen’s Medical Center sought to transform the 10th floor of the Queen Emma Tower to support the changing needs of maternity and neonatal care. Part of this vision was a new Level 3 Neonatal Intensive Care Unit (NICU), alongside updated Labor, Delivery, Recovery and Postpartum (LDRP) environments.

At a glance

The Queen’s Medical Center sought to transform the 10th floor of the Queen Emma Tower to support the changing needs of maternity and neonatal care. Part of this vision was a new Level 3 Neonatal Intensive Care Unit (NICU), alongside updated Labor, Delivery, Recovery and Postpartum (LDRP) environments. 

The renovation would create a more supportive setting for mothers, newborns and families while giving clinical teams spaces designed around contemporary care. Flexibility was also key, allowing the facility to respond as clinical practices and technologies evolve.
The challenge

The challenge

Planning approximately 24,000 square feet of renovation within an active hospital required the design to respond to complex clinical and building constraints. Maternity and neonatal services needed to remain operational, placing careful phasing at the center of the project approach. 

The existing facility also had to accommodate specialized medical equipment and infrastructure upgrades while meeting infection control, life-safety and noise mitigation requirements. Resolving these interdependent needs was critical to developing a design that could support complex care without losing sight of the experience of patients, families and staff.

Our response

Our response

We brought healthcare planning, architecture, engineering and medical equipment coordination together around the clinical needs of the 10th floor. Reconfiguring the space for the proposed Level 3 NICU allowed us to develop room layouts that supported privacy and staff visibility, while updates to the LDRP environments responded to the needs of mothers, newborns and care teams. 

Our phasing strategy provided a pathway for critical departments to remain operational during the proposed renovation. We coordinated mechanical and electrical systems with power, data and medical equipment requirements so the design could support specialized clinical workflows and accommodate evolving technology. 

We paired this technical planning with patient- and family-centered design principles. Hospitality-inspired interiors introduced a warmer character to the clinical environment, helping create spaces designed around comfort during significant moments in a family’s care journey.

The impact
Creating a future-ready environment for maternity and neonatal care

The impact

The project progressed through the Construction Documents phase, giving The Queen’s Medical Center a coordinated design for the proposed maternity and neonatal renovation. The documentation brought the architectural, engineering and medical equipment requirements together into an implementation-ready design for a new Level 3 NICU and updated LDRP environments. 

Although the renovation was ultimately not constructed because of funding constraints, the completed design work gave the client a resolved approach to the 10th-floor transformation. It addressed how upgraded infrastructure could work with specialized clinical spaces while accounting for infection control and staff workflows within the existing hospital.