What are the biggest challenges facing new nuclear energy projects today?

AdobeStock_269125404_nuclear energy project.jpeg

A global renaissance of nuclear energy is taking place as countries grapple with issues including fuel supply, rising costs and energy sovereignty. However, new nuclear energy projects face a range of risks and challenges, including establishing a viable business case, securing financing, navigating complex regulation, selecting and preparing a suitable site, building community confidence, coordinating specialist delivery resources and planning for waste over the full facility lifecycle.

All of these challenges are closely connected. Decisions about the site, technology and delivery model can affect approvals, supporting infrastructure, project cost, schedule and long-term operations.

Nuclear investment is growing, but projects face interconnected commercial, regulatory, infrastructure and delivery challenges.

Why are nuclear projects difficult to finance and plan?

Nuclear developments require substantial early planning before construction can begin. Project owners and investors need confidence in the business case, funding approach, site, technology, regulatory pathway and delivery programme.

Uncertainty in any of these areas can affect investment decisions. Site constraints may require additional infrastructure; approval requirements may influence the programme; and delivery capacity can affect cost and scheduling assumptions.

Early feasibility studies, due diligence, financial planning and supply-chain assessment allow project teams to test these assumptions before committing to a development pathway.

What makes nuclear regulation so complex?

Nuclear projects operate within rigorous safety, quality, environmental and planning frameworks. The exact process differs between jurisdictions, but projects may require nuclear licensing, environmental assessment, planning approvals, construction permissions and ongoing regulatory assurance.

Operators are also responsible for making sure that vendors and consultants work in accordance with the applicable nuclear quality systems, which creates extensive requirements for documentation, oversight, design assurance and quality management across the supply chain.

Regulatory planning needs to begin early and stay connected to design, procurement, construction and operational decisions throughout the project.

Why does site selection matter?

When identifying available land, developers must consider geology and seismic conditions, environmental constraints, access to water, grid capacity, road/rail access, nearby communities and the infrastructure required to support construction and operation.

Many nuclear projects are developed on or near existing industrial sites, creating additional considerations around site readiness, environmental requirements and integration with ongoing operations. Early assessment and planning are critical to understanding site constraints, opportunities, approval requirements and long-term viability.

What supporting infrastructure do nuclear projects require?

The reactor is only one part of a functioning nuclear facility. Projects also require:

  • Water-intake, cooling and discharge systems
  • Wastewater and water-treatment infrastructure
  • Substations, backup power and grid connections
  • Site utilities and power distribution
  • Access roads, rail connections and logistics areas
  • Facilities for administration and waste storage
  • Interfaces between the nuclear island, turbine island, and balance-of-plant systems
  • Security infrastructure

Coordinating these interconnected systems can be challenging, particularly when projects involve multiple contractors, strict quality requirements and demanding delivery schedules. Early planning and strong interface management help reduce risk and improve project readiness.

Why does community support matter for nuclear energy projects?

Nuclear projects often attract significant interest from communities, governments, regulators and other affected groups. People want clear information about safety, construction and environmental impacts, water use, long-term operations and radioactive waste management.

Stakeholder engagement should begin early enough to inform project decisions and continue throughout the life of the project. Where projects affect the rights or interests of Indigenous Peoples, engagement should be approached in a way that recognises those distinct rights and relationships. Successful projects involve ongoing dialogue to understand and address concerns.

Building confidence takes time and requires transparency, meaningful engagement and a willingness to respond to community feedback.

How should radioactive waste be managed?

Waste management is a whole-of-lifecycle responsibility. Project owners must consider how radioactive waste will be classified, handled, monitored, stored and ultimately sequestered for long term-controlled storage or otherwise disposed of, as well as who retains responsibility over the long term.

Waste management can influence environmental approvals, operational planning, regulatory confidence and community discussions, and should be considered as early as possible. Decommissioning should also be addressed during planning. Decisions made during design and operations can influence how safely and efficiently a facility can eventually be taken out of service and decommissioned.

What must project owners establish early?

Before progressing major investment and design decisions, project owners must establish:

  • Market demand for additional capacity and desired type of electricity offtake agreement
  • Project ownership structure
  • Whether the site and supporting infrastructure can meet project requirements
  • Which regulatory and environmental pathways apply
  • How the project will be financed and delivered
  • Whether sufficient workforce and supply chain capacity is available
  • How design and contractor interfaces will be managed
  • How communities, governments and Indigenous Peoples will participate
  • Desired amount of government support and oversight
  • How waste and decommissioning responsibilities will be managed over time

Resolving these questions early can give decisionmakers a clearer view of project readiness, key dependencies and the work required to move forward.

Connecting the elements of nuclear project delivery

GHD supports nuclear operators and industry partners across feasibility, site readiness, owner’s engineer support, business-case development, permitting, environmental assessment, stakeholder engagement, balance-of-plant infrastructure modification design, grid integration, water systems, and waste management and decommissioning. We also support nuclear license owners in the nuclear fuel cycle.

GHD supported Bruce Power in developing its 2027 Net-Zero Strategy, beginning with the identification and quantification of emissions to help determine appropriate reduction measures and provide guidance on offsetting remaining emissions. The resulting roadmap brings together short-, medium- and long-term actions across energy and emissions reduction, lower-carbon alternatives, offsets and the wider value chain.

In the UK, GHD supports Nuclear Licence Holders across the nuclear fuel cycle. GHD has also been selected by Morgan Sindall Infrastructure, alongside Baker Hicks, as a design partner on the Sellafield Infrastructure Delivery Partnership framework. GHD will support the maintenance and upgrade of Sellafield’s electrical network, part of a wider programme delivering the essential infrastructure needed for the site’s nuclear decommissioning and waste-management activities.

Bringing technical, environmental, regulatory, infrastructure and operational considerations together give decision makers a stronger basis for planning projects and managing nuclear assets over time.

AdobeStock_682810943_digital_twin.jpeg

Want to go deeper?

Creating a brighter, more sustainable future against volatility and uncertainty requires wide-ranging collaboration, constant innovation and unwavering commitment.
Read the full report

Related services

  • 181558240.jpg

    Power

    Power is an increasing priority for clients amid growing climate change.

  • GettyImages-910177948_meeting in a room.jpg

    Business Case

    Facilitating evidence-based investment decisions to deliver opportunities.

Related insights

Related projects

Webinars